Showing posts with label Metrolink. Show all posts
Showing posts with label Metrolink. Show all posts

Thursday, 6 August 2009

New tram stops in Bury and proposed 2nd city line in Manchester City Centre

Government funding has been granted to build two new Metrolink stops - Queens Road and Abraham Moss - on the Bury line. Transport Minister Sadiq Khan announced the funding on Tuesday as part of £30m million allocated to new transport projects. A Manchester Evening News broadcast of the news can be viewed here. Also, plans to add a tram line from Rochdale to Manchester via Cross Street in Manchester City Centre, as a means of bypassing Piccadilly Gardens and St Peter's Square, have been sent to government officials for approval. Please scroll down to read more on both events.

New tram stops

Following news of new tram stops being introduced in Oldham previously, new stops are to now be added in Bury. Councillor Keith Whitmore, chair of the Greater Manchester Integrated Transport Authority Chair (GMITA), said of the new tram stops: “This is fantastic news for people living in North Manchester. These new stops will open up transport opportunities to thousands more households in the area.”

Council leader Sir Richard Leese has said that the new stops should be in use at the same time as the wider Metrolink expansion, which is due to be up and running by 2012. Commuting times from Abraham Moss to Victoria will be five minutes by tram. The Queens Road stop will be located close to Collyhurst and the journey time to Piccadilly Gardens will be seven minutes. The new stops will open up Metrolink services to 34% more people living within 400 metres of a stop.

2nd city tram line

A 'business case' has been sent to the Department for Transport (DfT) for a second city-centre tram crossing to help cope with the hundreds of extra services which will become available when the `Big Bang' extensions are built to Rochdale, Oldham, Ashton and the airport. Transport bosses believe that the current Metrolink line from Victoria to Piccadilly and Manchester Central does not have enough capacity to cope with an extended system, so they would want a new line to bypass Piccadilly Gardens and St Peter's Square.

A new map of the extended Metrolink network showing the new stops can be viewed here. A map showing the proposed 2nd line between Manchester Central and Victoria through the city centre can be viewed here.

[+/-] Show Full Post...

Monday, 13 July 2009

Bus services finalised for Oldham Loop Line closure

With the train lines in Oldham set to close at the start of October in preparation for the new trams, the GMPTE have finalised a special package of enhanced bus services, in order to cater for passengers who would normally be travelling to and from Oldham on these trains. The changes will provide a mixture of express and high frequency services that reflect the types of journeys currently made on the Loop Line. In addition, GMPTE has modified its subsidised services to support these changes to ensure that an appropriate level of service is provided. Transport bosses used the results of two surveys detailing the journeys that passengers are currently making to create the new timetables, which will be in place for 2 ½ years.

Commuters can look forward to up to 18 buses an hour between Oldham and Manchester and a doubling of the number of buses that will link Milnrow, Newhey and Shaw with Manchester, including a faster service at peak periods that will also serve Buckstones. A new link is also being provided to Rochdale railway station from Shaw, Newhey and Milnrow, as rail services will be running as normal between Manchester, Rochdale and Leeds. Normal bus fares will apply on all the services, including special value tickets.

Over the summer, public information events will be held, and leaflets and timetables will be widely available. Information will also be sent to local businesses and employers, as well as to community centres and libraries. For more information you can visit GMPTE or view the changes to the bus services below.

Changes to services:

Service 20 (renumbered X82) (Milnrow/Buckstones/Shaw/Manchester) will have some extra peak hour journeys added giving a semi-express journey into Manchester.

Service 24 (Rochdale/Royton/Chadderton/Manchester) will operate every 30 minutes (instead of every 15 as at present) to accommodate increased frequencies on other services.

Services 181 and 182 (Manchester/Chadderton/Shaw/Rochdale) will double in frequency to every 15 minutes and will operate every half hour via Rochdale Rail Station; the Bluebird service twice per hour will also continue.

Service 159 (Oldham/Chadderton/Woodhouses/Failsworth/New Moston/Middleton): hourly daytime service re-timed to improve links from Failsworth and New Moston with Moston Rail Station.

Service 419 (Ashton/Chadderton/Werneth/Mills Hill/Middleton): half-hourly daytime service re-timed to improve links from Werneth and Chadderton to Mills Hill Rail Station, where a number of passengers may choose to travel from once the line is closed.

Service 408 (Stalybridge/Oldham/Shaw/Buckstones): the hourly evening and Sunday service will be timed to co-ordinate as closely as possible with the main bus service at Shaw.

Also available: Services 58 and 59 (Rochdale/Rushcroft/Shaw/Oldham/Mills Hill Station/Middleton/Manchester) which operate every seven to eight minutes between Shaw and Middleton, and every 15 minutes on other sections of route.

[+/-] Show Full Post...

Thursday, 18 June 2009

Could Oldham get two tram lines running through the town centre?

GMPTE bosses and local businesses are holding talks on how to make the most of taking trams into Oldham. Work has already started to convert the Oldham Loop railway line to Metrolink by autumn 2011 with the existing train stations at Werneth and Oldham Mumps being converted into tram stations, and other new tram stops being built between Manchester Victoria and Rochdale (click here to view the tram route). However, last month's announcement that a new Metrolink line will run through Oldham town centre itself, creating 6 tram stops instead of the initial 2, has forced a rethink, as it could result in trams running parallel through Oldham. Therefore, people could be able to catch one tram into Oldham town centre or a different one to send them round the outskirts and towards Manchester or Rochdale more quickly (as this route map here shows).

Oldham Council leader, Councillor Howard Sykes, explains the problem: “If we had both [lines], one would assume some trams would go round the town centre and some would go through. It means the existing site of the railway line is kept, while the original plans were that it would be given up”.

Greater Manchester Passenger Transport Executive will now discuss with local businesses over the new few weeks whether there's a future for both lines or should they scrap the 'outer' line (Oldham Werneth to Oldham Mumps) plan when the town centre line is built. There are 3 proposals which will be discussed:

1. create a new ‘Mumps’ stop between Bell Street and Brook Street, next to Mumps Bridge, which would enable the two lines to co-exist. An artist’s impression of the new Metrolink bridge at Mumps roundabout can viewed here:
2. create a new stop at the Rhodes Bank end of Union Street which would serve the town centre line
3. refurbish the existing Mumps train station

A planning application will be submitted next month for a new ‘Mumps’ stop between Bell Street and Brook Street. Once this application has been submitted, there will be a formal public consultation regarding the issue.

[+/-] Show Full Post...